
Injection molding · IML · In production
Lid and label inspection
- Problem
- Parts with a missing or crooked lid or a faulty label must not pass; the product range changes often.
- Done
- Two inspection stations and four cameras on the line. Each product is taught from a good sample; adding a new product is a step the operator can do. The result (OK/NG) is written to the PLC over Modbus TCP and faulty parts are rejected.
- Result
- About 105,000 inspections in three months; 22–28 ms per inspection.
HALCON · Python · C# · Modbus TCP





